DONGGUAN SHENGDA HARDWARE PRODUCTS FACTORY
TEL:(86-769)-86637544
FAX:(86-769)-86317703
Contact:Mr.Ye
Mobile:86-(0)13902641571
Address:Shijie Town, Dongguan City, Guangdong Province, South Water Chan Uk Industrial Zone
Website:http://www.sd668.com
Alibaba:
http://sunnysdcheng.cn.alibaba.com
B2B:
http://dgsd668.b2b.hc360.com
E-MAIL:shengda@sd668.com

View news

Current Location:Home > News center > View news
Built in the "spring" on the "full floating construction of" New Shanghai Symphony Hall cap structure
[Release date:2013-05-23  Reading:4343 ]

  Reporter Krzysztof informed resurgence Road in Shanghai, Shanghai Symphony Orchestra 1380 New Hall has been officially cap structure, is expected to put into use next year. Shanghai Symphony Orchestra, Shanghai relocation project is of major projects, has 134-year history of the Shanghai Symphony Orchestra, the dependence of the hardware facilities leap, will finally have their own concert hall. New site to see the orchestra, a 1200's Symphony Hall (Hall), and a high-quality recording with the efficacy of 400 Chamber Music Hall where they stand, the hall at the top of "saddle" surface modeling has been demonstrated. The first volume of the persons concerned, Auditorium Theatre in all projects is recognized as the most ambitious project, as the symphony played without amplification equipment, completely relying on the construction of acoustics, which requires the design, construction, should be accurate, a slight mistake, it will happen on the show sound different levels. Shanghai Symphony greater challenges facing the new hall is that it is located in the historical cultural relics protection zones renewed road, building height restrictions, about half of the construction of the underground structures need to complete; while re-rail line 10 through the underground hall , how to deter subway vibrations, but also to prevent noise problems, and no mature domestic history can learn. In order to overcome these difficulties, handed invited by world-class masters Arata Isozaki and Yasuhisa Toyota led the design team that built the design listen to acoustic design. Huge objective situation, the situation brought about by the problem, but the achievements of the new hall handed a major breakthrough in the design philosophy - via a ratio of 10 to complete the construction of the acoustic test mold design; built music into the home and the first one built in " Spring "on the" full floating construction "; all walls and the top are making a double hollow design, perfect to achieve a" room in the room "of this design philosophy. A symphony of success, largely relying on having a set on rehearsals, performances, recordings and music education in one of the concert hall. Like the Vienna Philharmonic Orchestra with golden hall, part of the Berlin Philharmonic Berlin Philharmonic Hall. The Shanghai Symphony Orchestra had a big regret, that is not their own dedicated theater, resulting in rehearsal and the reality of the theater acoustics vary, but a set of tracks as usual only half the time in the theater of the walkway, which makes Orchestra rehearsal usually results do not truly implemented. Late last year, the Shanghai Symphony Orchestra invited American conductor Alan Gilbert to Shanghai New Year's concert under the baton of Shanghai, because the U.S. track style choreography significant number of variety of attack instrument had to be turned over to the old split in the rehearsal hall two corners, difficult to interact with each other.

   News from: Spring, rivets manufacturers, Dongguan Shengda Hardware Factory site: www.sd668.com

  Print this page | Closed the window
ProvidedSpeaker mesh, heat sink, shield, battery shrapnel metal stamping, Experience, quality of clearance, price concessions, welcome new and old customers call to Han
ADD:Shijie Town, Dongguan City, Guangdong Province, South Water Chan Uk Industrial Zone TEL:(86-769)-86637544 FAX:(86-769)-86317703
All Rights Reserved © DONGGUAN SHENGDA HARDWARE PRODUCTS FACTORY